What one more kWh costs before tax, from every province's main utilities. Each rate was read from the utility's or regulator's own tariff on 2026-11-25, and links to it.

Marginal rate by utility

Includes energy, per-kWh delivery and riders. Fixed monthly charges are listed for context; a miner doesn't change them. The bars run to 40¢; the far north goes past that.

WhereUtility areaRate plan¢/kWhFixed/moEffectiveSource
British ColumbiaBC HydroResidential tiered (RS 1101), step 2 13.87¢$7.02 2026-04-01BC Hydro electric tariff
BC HydroResidential flat (RS 1151, optional) 12.51¢$7.49 2026-04-01BC Hydro flat rate
BC HydroSmall general service (RS 1300, under 35 kW) 13.85¢$12.24 2026-04-01BC Hydro electric tariff
AlbertaEdmontonRate of Last Resort + EPCOR delivery 19.33¢$29.14 2026-01-01EPCOR Edmonton rates; EPCOR system access tariff 2026
CalgaryRate of Last Resort + ENMAX Power delivery 19.19¢$35.96 2026-01-01ENMAX Power 2026 rate schedule
FortisAlberta areasRate of Last Resort (EPCOR) + FortisAlberta Rate 11 19.76¢$39.35 2026-01-01FortisAlberta 2026 rates and riders
ATCO Electric areasRate of Last Resort (Direct Energy) + ATCO D11 25.83¢$68.11 2026-01-01ATCO Electric 2026 price schedules
SaskatchewanSaskPowerResidential standard (E01 urban / E03 rural) 15.48¢$31.16 2026-02-01SaskPower residential rates
SaskPower, municipal surchargeResidential standard + 10% municipal surcharge 17.02¢$31.16 2026-02-01SaskPower: reading your bill
SaskPower, small commercialSmall commercial (E75/E76), energy beyond 14,500 kWh a month 6.39¢$42.79 2026-02-01SaskPower commercial rates
ManitobaManitoba HydroResidential standard 9.97¢$9.84 2026-01-01Manitoba Hydro residential rates
Manitoba Hydro, general serviceGeneral service small, energy beyond 11,000 kWh a month 7.57¢$21.57 2026-01-01Manitoba Hydro commercial rates
OntarioHydro One (R1, medium density)Time-of-use, running 24/7 12.79¢$72.73 2026-11-01OEB electricity rates; Hydro One rates
Hydro One (R1, medium density)Tiered, tier 2 14.03¢$72.73 2026-11-01OEB electricity rates; Hydro One rates
Hydro One (R1, medium density)Ultra-low overnight, 11 p.m. to 7 a.m. only 5.41¢$72.73 2026-11-01OEB electricity rates
Toronto HydroTime-of-use, running 24/7 12.45¢$49.11 2026-11-01Toronto Hydro rates
Toronto HydroTiered, tier 2 13.60¢$49.11 2026-11-01Toronto Hydro rates
Toronto HydroUltra-low overnight, 11 p.m. to 7 a.m. only 5.59¢$49.11 2026-11-01Toronto Hydro rates
QuébecHydro-QuébecRate D, second block 11.14¢$14.03 2026-04-01Hydro-Québec electricity rates 2026
Hydro-QuébecFlex D, winter, outside peak events 9.10¢$14.03 2026-04-01Hydro-Québec electricity rates 2026
Hydro-Québec, small powerRate G, energy beyond 15,090 kWh a month 9.53¢$15.43 2026-04-01Hydro-Québec electricity rates 2026
New BrunswickNB PowerResidential 15.84¢$30.82 2026-04-14NB Power residential rates
NB Power, general serviceGeneral service I, energy beyond 5,000 kWh a month 13.04¢$30.87 2026-04-14NB Power rate schedules 2026–27
Nova ScotiaNova Scotia PowerDomestic service 19.13¢$20.08 2026-05-01Nova Scotia Power rates; NS Power tariff book 2026
Nova Scotia Power, small generalSmall general, beyond 200 kWh a month 17.92¢$22.00 2026-05-01NS Power tariff book 2026
Prince Edward IslandMaritime ElectricResidential (110), energy beyond 2,000 kWh a month 14.23¢$24.57 2026-08-01IRAC Order UE26-07
Maritime Electric, general serviceGeneral service (232), beyond 5,000 kWh a month 14.38¢$24.57 2026-08-01IRAC Order UE26-07
Newfoundland and LabradorIslandDomestic (Rate 1.1) 15.59¢$17.36 2026-07-01Newfoundland Power rate book, July 2026
Island, general serviceGeneral service (Rate 2.1), beyond 3,500 kWh a month 12.19¢$22.07 2026-07-01Newfoundland Power rate book, July 2026
Labrador interconnectedDomestic (Rate 1.1L) 3.15¢$6.87 2026-07-01NL Hydro schedule of rates, July 2026
Yukon, NWT and NunavutYukonResidential, beyond 2,500 kWh a month 30.02¢$31.44 2026-04-01ATCO Electric Yukon rates, April 2026
YellowknifeSnare zone residential, with riders 37.40¢$19.96 2026-10-01Naka Power rate schedule, October 2026
NWT thermal zone (Inuvik and others)Residential, beyond 1,000 kWh a month 84.68¢$18.00 2026-09-01NTPC residential rates
NunavutResidential, beyond the subsidized block not confirmed current 74.94¢$18.00 2023-10-01QEC customer rates

Rules on crypto mining loads

British Columbia BC Hydro is permanently relieved of serving new crypto-mining projects of 2.5 MW or more (B.C. Reg. 164/2025, made permanent October 2025). The rule has no residential provision and doesn't reach home-scale miners. Government of BC: cryptocurrency mining policy
Alberta No crypto-specific electricity rule found.
Saskatchewan No crypto-specific electricity rule found on SaskPower's site.
Manitoba Two 2026 laws are passed but not yet in force. One lets Manitoba Hydro run a curtailable program for crypto customers (SM 2026 c. 17). The other creates a crypto customer class billed at General Service rates plus a levy that defaults to 100% (SM 2026 c. 32). That Act defines a crypto operation by its equipment and sets no minimum size, so home miners could be covered unless regulations narrow it. A pause on new crypto connections ran to April 30, 2026; what replaced it isn't confirmed. Bill 39 (2026); Bill 20 (2026); Manitoba Hydro: pause on new crypto connections
Ontario No crypto-specific electricity rule found (OEB, Hydro One, Toronto Hydro).
Québec Mining under 50 kW isn't prohibited, but more than 10 kW of non-household load moves an account from Rate D to the general Rate G. From 50 kW, crypto loads go on Rate CB, need Québec government authorization, and new allocations are suspended. For smaller crypto loads Hydro-Québec may ask for a deposit or install a communicating meter. In February 2026 it proposed raising the crypto rate to about 19.5¢; the regulator's decision isn't confirmed. Hydro-Québec electricity rates 2026; Hydro-Québec conditions of service
New Brunswick The Electricity Act, s. 91(3), says a distribution utility shall not extend supply to a cryptocurrency mining business. The term isn't defined and there's no size threshold; whether a hobby miner counts as a business hasn't been tested. A home meter also allows only 2 kW of business load before General Service I applies. Electricity Act (NB), s. 91
Nova Scotia No crypto rule found. A separately metered outbuilding used mainly for commercial purposes goes on the General tariff; one used for your own hobbies stays on Domestic.
Prince Edward Island No crypto-specific electricity rule found.
Newfoundland and Labrador Newfoundland Power's domestic rate excludes a service with more than 3 kW of non-domestic load (not counting space heating), so a full-size miner can move you to Rate 2.1. In Labrador East and West, NL Hydro accepts no new connection adding more than 200 kW. A provincial order reportedly exempts NL Hydro from supplying crypto miners; we couldn't find its text on an official page. NL Hydro schedule of rates, July 2026
Yukon, NWT and Nunavut No crypto-specific electricity rule found in Yukon, the NWT or Nunavut.

Sales tax on power

  • British Columbia: GST 5%
  • Alberta: GST 5%
  • Saskatchewan: GST 5% (PST 6% may also apply; not confirmed)
  • Manitoba: GST 5% + RST 7%
  • Ontario: HST 13%, charged before the 15.7% rebate
  • Québec: GST 5% + QST 9.975%
  • New Brunswick: HST 15%
  • Nova Scotia: HST 14%
  • Prince Edward Island: HST 15%
  • Newfoundland and Labrador: HST 15%
  • Yukon, NWT and Nunavut: GST 5%